Skip to content

Field note

Plumbing for a Basement Renovation

The plumbing decisions in a basement renovation are the ones that are hardest to change later. Plan them before the framing goes up.

  • Have ready: measured floor plan
  • Have ready: location of existing rough-ins
  • Have ready: permit checklist
  • Call us if anything looks worse than the guide describes
Call (365) 517-7959

Talk to a plumber now.
No forms, no waiting list.

  • Licensed & insured (details on request)
  • Phones answered 7 days a week
  • Oshawa & Durham Region
  • Upfront diagnosis before work
Metal water distribution manifold with several outlets
A water distribution manifold, where each line can be shut off on its own.

Why it matters here

Finishing the basement is one of the most popular projects in Durham, whether for a family room, a home office or a legal secondary suite. Under the floor and behind the walls you are covering drains, supply lines, the main shut-off, the sump and possibly a backwater valve. Once the drywall is up, every problem costs more to reach.

Step by step

  1. Check the existing drains. A camera inspection of the main sewer before you cover the floor is worth it in older homes.
  2. Plan the bathroom. Know whether the drains are below the floor already (a rough-in) or need a new trench or an up-flush system.
  3. Add a backwater valve if there is not one. It is easiest before the floor is finished.
  4. Keep access. Plan removable panels for the main shut-off, cleanouts, valves and the sump.
  5. Think about the water heater. If you are adding a bathroom or suite, check that it can keep up.
  6. Get permits. New plumbing in a finished basement typically needs a permit from the City of Oshawa.
  7. Insulate pipes near exterior walls before they are enclosed.

Take photos of the open walls before drywall goes up. Note where pipes run. Future you will be glad.

Mistakes to avoid

  • Covering a sump pit or cleanout with flooring.
  • Building a bathroom without proper venting.
  • Running supply lines along cold exterior walls without insulation.
  • Skipping a permit, which can cause problems when you sell.

When to call a plumber

Call at the planning stage, ahead of any framing. We can review the layout and check that the drains and venting work. Common jobs include sump pump installation, rough-ins and shower valve work. Once finished, learn the quiet signs of a hidden leak so problems are caught early.

From our call log

Can I add a bathroom anywhere in the basement?

Close to the existing drain is easiest. Further away is possible with trenching or a pump system.

How a visit runs

  1. 1

    Call

    Describe the fixture, the floor and how old the building is.

  2. 2

    Look

    We pull the trap, the cleanout plug or the access panel before any price is given.

  3. 3

    Explain

    You hear what failed and what we would replace, in plain words.

  4. 4

    Fix

    Water off, old part out, new part in, joints supported.

  5. 5

    Test

    Full flow or full pressure, every joint checked dry.

Water on the floor right now?

Turn the main shut-off clockwise and ring (365) 517-7959.

Call (365) 517-7959
Call (365) 517-7959